eLibrary Search
The FRA eLibrary contains all the documents that are found throughout the FRA Public Website. Multiple pages on the website may link to the same eLibrary item based on its set of metatdata.
Can I find All FRA Documents in the Library?
Some "documents" may not appear here for the following reasons:
- Document resides on an external site for the record of source, links to the document are provided in context but not in the library as FRA does not maintain this record. This document lives on another website.
- Document has not yet been assigned keywords.
- Document is historical and has been removed from library to avoid confusion with current publications.
- Document is public affairs & policy related, such as press releases, speeches, testimony, or fact sheet. These press-related documents can now be found in the FRA Newsroom.
- Document is related to rules and notices. This information can now be found on the Rulemakings search and the Notices search, respectively.
Technical Reports
PTC Communications: Cybersecurity Technology Review and Concept of Operations
Keywords: Positive Train Control, PTC, railroad, shared network, Interoperable Train Control Messaging, ITCM, cybersecurity, encryption, National Institute of Standards and Technology, NIST, ELLI
Abstract: Researchers sought to determine how to improve the confidentiality of information passing through the...
Technical Reports
An Independent Evaluation of the Switching Operations Fatality Analysis 2010 Working Group's Processes
Keywords: Evaluation, SOFA, Fatality, Rail
Abstract: The Switching Operations Fatality Analysis (SOFA) Working Group was formed to analyze the factors contributing to fatalities in switching operations. The 2010 Working Group...
Technical Reports
15th Railroad Engineering Conference Proceedings, Railroad R&D Challenges of the 80's : Opportunities & Obstacles
Abstract: This report constitutes the proceedings of the 15th Railroad Engineering Conference held at TSC on October 21-23, 1979. Conference papers were delivered by various industry and...
Technical Reports
Test Specification #7115 for Switchyard Impact Tests (RPI-AAR Phase 15)
Keywords: Switchyard Impact Tests, Reduction Requirements, Instrumentation Requirements, Physical Pre-Test Measurement Techniques
Abstract: This report contains information regarding test specification #7115 for switchyard impact tests. It covers test requirements, photo coverage requirements, instrumentation...