eLibrary Search
The FRA eLibrary contains all the documents that are found throughout the FRA Public Website. Multiple pages on the website may link to the same eLibrary item based on its set of metatdata.
Can I find All FRA Documents in the Library?
Some "documents" may not appear here for the following reasons:
- Document resides on an external site for the record of source, links to the document are provided in context but not in the library as FRA does not maintain this record. This document lives on another website.
- Document has not yet been assigned keywords.
- Document is historical and has been removed from library to avoid confusion with current publications.
- Document is public affairs & policy related, such as press releases, speeches, testimony, or fact sheet. These press-related documents can now be found in the FRA Newsroom.
- Document is related to rules and notices. This information can now be found on the Rulemakings search and the Notices search, respectively.
Emergency Declarations
The FRA Administrator’s Declaration of Emergency Event: Tropical Storm Cristobal
Keywords: Tropical Storm Cristobal
Technical Reports
Concepts for Interoperable Lifecycle Management of Positive Train Control (PTC)
Keywords: Positive Train Control, PTC, change and configuration management, interoperability, lifecycle management, information technology infrastructure library, ITIL, information technology service management, ITSM
Technical Reports
Evaluation of PTC Braking Enforcement Algorithms for Passenger and Commuter Trains
Keywords: Braking algorithm, enforcement algorithm, Positive Train Control, PTC, simulation, Monte Carlo simulation, passenger train
Abstract: Software algorithms used in Positive Train Control (PTC) systems designed to predict passenger train stopping distance and enforce a penalty brake application must be evaluated...
Emergency Declarations
FRA Administrator’s Declaration of Emergency Situation: Novel Coronavirus 2019 (COVID-19)
Keywords: COVID19
Technical Reports
Positive Train Control (PTC) Monitoring and Analysis of the Integrated Network (MAIN) - Phase I
Keywords: Monitoring and Analysis of Integrated Network, MAIN, Positive Train Control, PTC, PTC monitoring, PTC troubleshooting, Interoperable PTC, shared PTC assets