eLibrary Search
The FRA eLibrary contains all the documents that are found throughout the FRA Public Website. Multiple pages on the website may link to the same eLibrary item based on its set of metatdata.
Can I find All FRA Documents in the Library?
Some "documents" may not appear here for the following reasons:
- Document resides on an external site for the record of source, links to the document are provided in context but not in the library as FRA does not maintain this record. This document lives on another website.
- Document has not yet been assigned keywords.
- Document is historical and has been removed from library to avoid confusion with current publications.
- Document is public affairs & policy related, such as press releases, speeches, testimony, or fact sheet. These press-related documents can now be found in the FRA Newsroom.
- Document is related to rules and notices. This information can now be found on the Rulemakings search and the Notices search, respectively.
Technical Reports
Constant Warning Time Concept Development for Motorist Warning At Grade Crossings
Keywords: CWT, Magnetic Transducers, Acoustic Transducers
Abstract: This report investigates multiple methods for providing consistent warning times of the arrival of trains. Magnetic and acoustic detection methods showed the most promise.
Technical Reports
Lightweight Vehicle Track Shunting
Keywords: Signal/Control Systems, R&D, Grade Crossing Warning Systems
Abstract: The objective of this contract was to determine the extent of the shunting problem on lightweight rail vehicles and identify research recommendations to resolve it. This study...
Technical Reports
Evaluation of Signal/Control System Equipment and Technology: Task 6 - Specification Development
Keywords: Central Processing Unit, Communications, Maintainability, Military Standards, Reliability
Abstract: Development of a signal/control system for high speed 255 Km/h (160 MPH) train operation must proceed in a logical sequence. One step is a comparison of alternative candidate...
Technical Reports
Evaluation of Signal/Control System Equipment and Technology: Task 5 - Economic Studies
Keywords: Cost/Benefit Analysis, Life Cycle Evaluation, Reliability/Maintainability, Vandalism
Abstract: Economics form an important aspect in the comparison of new technologies with those which are subject to possible replacement. This report presents an economic analysis of...
Technical Reports
Northeast Corridor Improvement Project Task 205: Cab Signal/Automatic Train Control/Train Performance Recorder General Specification
Keywords: Cab Signal, Automatic Train Control, Train Performance
Abstract: This document defines the standards and general specifications for the cab signal/automatic train control/train performance recorder system to be installed on vehicles to be...