eLibrary Search
The FRA eLibrary contains all the documents that are found throughout the FRA Public Website. Multiple pages on the website may link to the same eLibrary item based on its set of metatdata.
Can I find All FRA Documents in the Library?
Some "documents" may not appear here for the following reasons:
- Document resides on an external site for the record of source, links to the document are provided in context but not in the library as FRA does not maintain this record. This document lives on another website.
- Document has not yet been assigned keywords.
- Document is historical and has been removed from library to avoid confusion with current publications.
- Document is public affairs & policy related, such as press releases, speeches, testimony, or fact sheet. These press-related documents can now be found in the FRA Newsroom.
- Document is related to rules and notices. This information can now be found on the Rulemakings search and the Notices search, respectively.
Technical Reports
Positive Train Control Communication Failures and Their Impacts: Case Study Using Generalized Train Movement Simulator
Keywords: PTC; GTMS; rail system simulation
Abstract:
Railroads with Positive Train Control (PTC) are experiencing increased delays due to communication failures and outages, during which trains are compelled to move at slower...
Technical Reports
Evaluation of Habituation to Alerts in Locomotive Cabs
Keywords: Habituation; inattentional deafness; alarm fatigue; locomotive engineer; Positive Train Control; PTC; alerter; human factors
Abstract:
From September 2019 to May 2022, the Federal Railroad Administration (FRA) funded KEA Technologies Inc. to conduct a pilot study using a rail simulator to determine whether...
Technical Reports
An Investigation of the Effects of Positive Train Control Systems on Track Maintenance
Keywords: Positive Train Control; PTC; Maintenance of Way; MOW; roadway worker protection; RWP; Employee-in-Charge; EIC; Roadway Worker in Charge; RWIC
Abstract:
The Federal Railroad Administration (FRA) contracted Transportation Technology Center, Inc. (TTCI) to conduct a broad analysis of the impacts of Positive Train Control (PTC)...
Technical Reports
Automated Weld Repair of Manganese Frogs for Extended Service Life
Keywords: Constant voltage; CV; flux-cored arc welding; FCAW; pulse gas metal arc welding; GMAW-P; radiographic testing; RT; ultimate tensile strength; UTS; yield strength; YS; rail frog; rail turnout; frog point; frog wings; solid state welding
Abstract:
EWI completed research and testing of an automated weld repair process for austenitic manganese steel railroad frogs. This report covers the second of two projects sponsored by...
Technical Reports
Very Long Trains – Phase II - Rack Tests
Keywords: Very Long Train, VLT, Air Brake System, Distributed Power
Abstract:
In Phase II of this research project, FRA sponsored Wabtec to perform train air brake tests on long trains at their facility in Wilmerding, Pennsylvania, between January 2021...