Addresses the importance of having clear safety and response procedures for use in the event of reports of railroad signal system problems
Document Series
Safety Advisories
Safety Advisory Number
2004-02
Subject
Signal and Train Control
Keywords
Signal and Train Control; hazardous material; manually operated switch; switch points; gapped switch
DOT is committed to ensuring that information is available in appropriate alternative formats to meet the requirements of persons who have a disability. If you require an alternative version of files provided on this page, please contact
FRADevOps@dot.gov.
Effective Date: Tuesday, August 10, 2004