Rainy Section Track Settlement Model
In collaboration with the Federal Railroad Administration, Transportation Technology Center, Inc. used the Rainy Section of the High Tonnage Loop at the Facility for Accelerated Service Testing in Pueblo, CO, to develop a new track settlement model. Research was conducted in 2019. The team developed a track settlement model from the Rainy Section testing and supplemented it with recent laboratory and track-based inspection system research.