Safety of High Speed Ground Transportation Systems: Work Breakdown Structure
Document Series:
Technical Reports
Author:
- Federal Railroad Administration; John A. Bachman
Report Number
DOT/FRA/ORD-94/03
Office
RRD
Subject:
Safety Advisories, Safety Regulatory Analysis, Safety Performance Measures
Keywords:
Systems management, Systems engineering, Systems elements, subsystems, System safety, Magnetic levitation, maglev, High speed rail, Maglev safety, High speed guided ground transportation, Work breakdown structure
Report Number
DOT/FRA/ORD-94/03
Office
RRD
DOT is committed to ensuring that information is available in appropriate alternative formats to meet the requirements of persons who have a disability. If you require an alternative version of files provided on this page, please contact
FRADevOps@dot.gov.
Last updated: Tuesday, November 30, 1993