Merced to Fresno Final EIR/EIS
Documents for download:
The files are in Adobe Acrobat PDF Format which is available for download at no cost on the Internet. (Note: many of these files are very large and could take up to several minutes to download). Copies of the Merced to Fresno Final EIS/EIS are also available on CD-ROM upon request by calling (916) 414-1582. More information is available on the Authority’s Webpage for the Merced to Fresno Final EIR/EIS.
Volume I
- 0.0 Cover and Signature Page
- 0.1 Fact Sheet
- 0.2 Preface
- 0.3 Table of Contents
- 0.4 Summary
- 1.0 Project Purpose, Need, and Objectives
- 2.0 Alternatives
- 3.1 Introduction
- 3.2 Transportation
- 3.3 Air Quality and Global Climate Change
- 3.4 Noise and Vibration
- 3.5 Electromagnetic Fields and Electromagnetic Interference
- 3.6 Public Utilities and Energy
- 3.7 Biological Resources and Wetlands
- 3.8 Hydrology and Water Resources
- 3.9 Geology, Soils, and Seismicity
- 3.10 Hazardous Materials and Wastes
- 3.11 Safety and Security
- 3.12 Socioeconomics, Communities, and Environmental Justice
- 3.13 Station Planning, Land Use, and Development
- 3.14 Agricultural Lands
- 3.15 Parks, Recreation, and Open Space
- 3.16 Aesthetics and Visual Resources
- 3.17 Cultural and Paleontological Resources
- 3.18 Regional Growth
- 3.19 Cumulative Impacts
- 4.0 Draft Section 4(f)/6(f) Evaluation
- 5.0 Project Costs and Operations
- 6.0 CEQA/NEPA Decision Process and Other Considerations
- 7.0 Preferred Alternative and Stations
- 8.0 Public and Agency Involvement
- 9.0 EIR/EIS Distribution
- 10.0 List of Preparers
- 11.0 References and Sources Used in Document Preparation
- 12.0 Glossary of Terms
- 13.0 Index
- 14.0 Acronyms and Abbreviations
Volume II
- Cover and Table of Contents
- 2-A Proposed Roadway Activities Along HST Alternatives
- 2-B Project Footprint
- 3.3-A Potential Impact from Induced Winds
- 3.3-B Draft Federal General Conformity Determination
- 3.4-A Noise and Vibration Mitigation Guidelines
- 3.5-A Applicability of Laws, Regulations and Standards for EMI/EMF
- 3.6-A Water Consumption Technical Memorandum
- 3.6-B Drawdown Calculations for 35 Gallons per Minute Well in Chowchilla Area
- 3.6-C Energy Usage Comparison
- 3.7-A Special-Status Plant and Wildlife Species with Potential to Occur in the Project Vicinity
- 3.7-B Special Status Plant and Wildlife Species Potentially Affected by the HST Alternatives
- 3.7-B Special Status Species Data - Exhibit 1
- 3.8-A Berenda Reservoir Technical Memorandum
- 3.10-A Potential Impacts on Schools from Hazardous Materials
- 3.11-A Safety and Security Data
- 3.11-B Existing and Proposed Railroad Crossings
- 3.12-A Relocation Assistance Documents
- 3.12-B Effects on School District Funding and Transportation Bus Routes
- 3.12-C Children’s Health and Safety Risk Assessment
- 3.12-D Summary of Issues/Concerns Affecting Schools
- 3.13-A Land Use Plans, Goals, and Policies
- 3.13-B Land Use and Communities Technical Memorandum
- 3.14-A Results and Findings of Land Evaluation and Site Assessment Pursuant to the Farmland Protection Policy Act
- 3.14-B Impacts on Confined Animal Agriculture Technical Memorandum
- 3.14-C High-Speed train Noise Disturbance on Grazing Lands
- 3.17-A Programmatic Agreement
- 3.18-A Planning Area Boundaries
- 3.19-A Planned and Potential Projects and Plans
- 3.19-B Planned and Potential Transportation Projects
- 5-A Operations and Service Plan
- 5-B Operating Cost Memorandum
Volume III
Information is available on the Authority’s Webpage for the Volume III
Volume IV
- Chapter 15 - 32 Cover and Table of Contents
- Chapter 15 Introduction
- Chapter 16 Standard Responses
- Chapter 17 Response to Comments from Federal Agencies
- Chapter 18 Response to Comments from State Agencies
- Chapter 19 Response to Comments from Local Agencies
- Chapter 20 Response to Comments from Businesses and Organizations
- Chapter 21 Response to Comments from Individuals A-C
- Chapter 22 Response to Comments from Individuals D-F
- Chapter 23 Response to Comments from Individuals G-J
- Chapter 24 Response to Comments from Individuals K-M
- Chapter 25 Response to Comments from Individuals N-R
- Chapter 26 Response to Comments from Individuals S-U
- Chapter 27 Response to Comments from Individuals V-Y
- Chapter 28 Response to Comments from Public Meetings and Hearings 8-23-2011
- Chapter 28 Response to Comments from Public Meetings and Hearings 8-24-2011
- Chapter 28 Response to Comments from Public Meetings and Hearings 8-25-2011
- Chapter 28 Response to Comments from Public Meetings and Hearings 9-14-2011
- Chapter 28 Response to Comments from Public Meetings and Hearings 9-15-2011
- Chapter 28 Response to Comments from Public Meetings and Hearings 9-20-2011
- Chapter 28 Response to Comments from Public Meetings and Hearings 9-28-2011
- Chapter 29 Response to Comments from Federal Agencies Post Comment Period
- Chapter 30 Response to Comments from State Agencies Post Comment Period
- Chapter 31 Response to Comments from Local Agencies Post Comment Period
- Chapter 32 Response to Statewide Comments