eLibrary Search
The FRA eLibrary contains all the documents that are found throughout the FRA Public Website. Multiple pages on the website may link to the same eLibrary item based on its set of metatdata.
Can I find All FRA Documents in the Library?
Some "documents" may not appear here for the following reasons:
- Document resides on an external site for the record of source, links to the document are provided in context but not in the library as FRA does not maintain this record. This document lives on another website.
- Document has not yet been assigned keywords.
- Document is historical and has been removed from library to avoid confusion with current publications.
- Document is public affairs & policy related, such as press releases, speeches, testimony, or fact sheet. These press-related documents can now be found in the FRA Newsroom.
- Document is related to rules and notices. This information can now be found on the Rulemakings search and the Notices search, respectively.
Technical Reports
Employee-In-Charge Portable Remote Terminal Phases 3 and 4 Summary Report
Keywords: Employee-in-charge, portable remote control, personal data assistant, Positive Train Control, Interoperable Train Control, Electronic Train Management System
Abstract: Under Federal Railroad Administration Task Order 257, Transportation Technology Center, Inc. partnered with BNSF Railway Company to complete Builds 1 and 2 of the Employee-In-...
Accident Investigations
HQ-2016-1127 (Finalized)
Keywords: Accident Investigations, Grade crossings, Norfolk Southern
Abstract: On May 3, 2016, at approximately 10:15 p.m., CDT, northbound Norfolk Southern (NS) Train A38A7-03 collided with an eastbound vehicle (pickup truck) at the 15th Place SW public...
Birmingham, AL
United States
Other Reports
Account Structure Definition and Accounting Methodology Improvements to Address Section 11201 of the FAST Act of 2015
Keywords: Amtrak, Account Structure, FAST Act, Service Lines, Asset Lines, NEC, National Network
Abstract: The Federal Railroad Administration, on behalf of the Secretary of Transportation, and in collaboration with Amtrak, established an account and reporting structure (Account...
Environmental Review Documents
Modifications to Indiana Gateway Project #7 Environmental Assessment (EA)